Power Monitor (ZL7261DE-5) manual for Z-Wave

The following is an overview of the user manual for the Z-Wave product Power Monitor (ZL7261DE-5)from Vision. To view other Z-Wave products and manuals from Vision follow that link.

  1. Overview
  2. Security
  3. Features
  4. Installation instructions

Overview

Name
Power Monitor
SKU Code
ZL7261DE-5
Description
This Power Monitoring On/Off Module is a Z-Wave™ enabled device (interoperable, two-way RF mesh networking technology) and is fully compatible with any Z-Wave™ enabled network. Every main powered Z-Wave™ enabled device acts as a signal repeater and multiple devices result in more possible transmission routes, which helps eliminate “RF dead-spot”.
Z-Wave™ enabled devices displaying the Z-Wave™ logo can also be used with it regardless of the manufacturer, and ours can also be used in other manufacturer’s Z-Wave™ enabled networks. This module will send On/Off signal to the appliance that attached to this module by receiving Z-Wave™ signal from controller or manually switch. It also sends the energy consumption to the controller when it requests. With special design, this module won’t interfere the other power outlet when plug into the AC outlet. This module also acts as repeater (supporting FLiRS).
Version #
HW: 2 FW: 24.02:33.00 was the version certified
Certification #
ZC10-18036064
Certified
2018-03-01T17:28:24.993518
Z-Wave Version
6.81.00

Security

As a Z-Wave Plus certified product, Power Monitor supports Z-Wave S2 security. The following security modes are directly supported:

  • S2 Authenticated
  • S2 Unauthenticated

Features

Vision describes Power Monitor as having the following features:

  • Supported Meter Type
  • FLiRS capable
  • Supports Network Wide Inclusion
  • Supports Z-Wave Explorer Frames
  • Supports Z-Wave SmartStart allowing you to setup the product simply by scanning its QR code via

Installation instructions

For “Inclusion” in (adding to) a network: Put the Z-Wave TM Interface Controller into “inclusion” mode, and following its instruction to add the ZL7261 into your controller. To get in the “Inclusion” mode. By power up to get included for first time, press the Program switch 3 times within 3 seconds to be included.

For “Exclusion” from (removing from) a network: Set up the Z-Wave TM Interface Controller into “exclusion” mode, and following its instruction to delete the ZL7261 from your controller. Press the Program Switch 3 times within 3 seconds to be excluded.

Factory reset Power Monitor

Reset: Press the Program Switch then power on (plug-in) and hold for 5 seconds before release the switch. Only use this procedure when the primary controller is lost or otherwise inoperable. (Remark: This is to be used only in the case of primary controller being inoperable or otherwise unavailable.)

The ZL7261 also supports energy metering, and meter information can be sent by the device to a listening controller automatically.

For “Meter Supported Get” : the Z-Wave TM Interface Controller sends “Meter Get” then “Scale” command that see what kind of power consumption measurement want to report back according to the scales below. Then ZL7261 will report back the energy consumption values.
Scale: 0x00-kWh;
0x01-kVAh
0x02-W
0X04-V
0X05-A
0X06-Power Factor

Support OTA Firmware update from controller. Please refer to your controller manual. Once OTA function success, please make sure to exclusive the device & inclusive again before use the device.

Please note that this is a user manual Power Monitor from Vision is provided as is and without warranty; all information contained herein is provided by the manufacturer or the certifying body. The information provided is for reference only and is not intended to be used as a substitute for professional advice. ZWaveProducts.com only warrants and is only able to support products purchased directly from us. If you have Power Monitor and have not purchased it from us, please contact the manufacturer directly with any further questions you may have.